ADU Design & Permitting Near You in Ontario, CA
If you’re searching for our ADU Design & Permitting services near you in the Ontario, CA area, Ellery ADU Studio covers Ontario and the surrounding Inland Empire cities under one contract at one written price – drawings, permit set, and construction, start to final inspection. Nadia Ellery founded the studio in 2015, the same year California’s ADU statutes began reshaping what backyard and garage lots could legally become, and every one of the 900-plus ADUs we’ve designed, permitted, and built since then started with a written price before any work began, per Haven Standard Clause 1.
We serve homeowners in Ontario, Chino, Eastvale, Montclair, Upland, Mira Loma, Rancho Cucamonga, and Glen Avon. A live person answers at (951) 577-3472, around the clock – no voicemail queue, no callback that doesn’t come. If you already have a written estimate from another firm, we’ll give you a free second opinion on it before you commit.
Fast, Local ADU Design & Permitting
Most Ontario homeowners who call us on a weekday have a site-assessment call scheduled within 24 hours. From that first call through submitted permit application, a straightforward Ontario ADU project typically takes six to eight weeks – faster than the regional average, because we treat the permit set as the core deliverable, not a paperwork afterthought we hand off to a third party.
Ontario’s Building & Safety Division reviews ADU applications under California’s streamlined ADU statutes, which mandate a 60-day ministerial review window for compliant submittals. Getting inside that window requires a permit set that is complete and code-correct on the first submission. Our drafting team works from Ontario’s current zoning maps and updated R1/R2 setback tables – the rear setback for a new detached ADU in most Ontario single-family zones is four feet from the rear and side property lines – so we’re not guessing at requirements your city will push back on.
Every project is quoted with a documented written scope. Under Haven Standard Clause 5 (No Surprises), that scope is locked at signing. The number on the page when you call is the number in the contract when you sign – not a starting point for door-side additions.
What “Near Me” Actually Means for an ADU Project

A designer two counties away can produce drawings. What they can’t do is walk your Ontario lot, read the utility easement running along your rear fence line, or recognize that your 1970s-era garage slab may be only three and a half inches thick – the threshold that determines whether a ADU Design & Permitting in Ontario project needs a new pour or can proceed with the existing foundation. Those field facts change line items. We document what we find and hand that documentation to you in writing, so you’re not making a six-figure decision on a verbal summary.
Ontario and the western Inland Empire have a few local conditions worth knowing before you design:
- Lot coverage: Ontario’s municipal code caps total lot coverage for residential parcels at 50 percent in most R1 zones. A new detached ADU counts toward that figure, so the math on your specific parcel matters early.
- Utility connection fees: San Bernardino County’s water districts – including Monte Vista Water District, which serves portions of Ontario and Montclair – charge ADU connection fees that can run $8,000 to $14,000 for a new service lateral, depending on meter size and distance from the main. We price this into the estimate from day one.
- Heat load: Ontario’s Inland Empire climate zone (CEC Climate Zone 10) means your ADU needs meaningful cooling capacity. We spec mechanical systems sized to the actual square footage, not the minimum the plan check will accept.
- Soil conditions: Portions of Eastvale and Mira Loma sit on expansive soils that require geotechnical review before a detached ADU foundation is designed. If your parcel is in one of those areas, we tell you up front – with the cost estimate, not after.
Those aren’t details a remote design firm in another metro will flag in a discovery call. They’re the kind of things Nadia Ellery and the studio’s field staff have learned from a decade of Inland Empire ADU work.
Areas We Cover
Ellery ADU Studio’s primary service area runs across the western Inland Empire. Ontario is our home base and where the bulk of our permit submissions go, but we regularly design and build ADUs in Chino, Eastvale, Montclair, Upland, Mira Loma, Rancho Cucamonga, and Glen Avon. Each city has its own fee schedule and zoning overlay details – Chino, for instance, has a tiered plan-check fee structure for ADUs over 600 square feet, and Rancho Cucamonga has specific HOA & Zoning Compliance standards for ADUs in hillside overlay zones – and we carry current code knowledge for each jurisdiction we serve.
If you’re not sure whether your parcel falls inside our coverage area, call (951) 577-3472. The person who answers can confirm your address and give you a clear answer in under two minutes – no form to submit, no wait for an email reply.
For a full breakdown of how we handle Ontario-specific permitting rules, setback requirements, and fee schedules, the home page includes a complete overview of every service category under the Ellery one-contract model.
Our Services, One Contract

We don’t hand off between departments or subcontract the permit set to a separate drafting firm. Every service below is covered under a single written agreement:
- ADU Design & Permitting – schematic design through approved permit set, including Title 24 energy calculations, structural engineering coordination, and all city submittal fees itemized in your written estimate.
- Garage Conversion ADU – full conversion of an attached or detached garage to permitted living space, typically $95,000 to $160,000 all-in for an Ontario single-car or two-car garage, drawings through final inspection.
- New Detached ADU – site-built or prefab/modular unit on a new foundation. In Ontario’s R1 zones, a 600-square-foot detached ADU generally runs $180,000 to $260,000 all-in, depending on site conditions, utility work, and finish level. Prefab and modular systems from brands like Abodu, Dvele, and Plant Prefab can compress the construction schedule; we coordinate all of these within the same single contract.
- Junior ADU & Interior Conversion – permitted conversion of an existing bedroom or interior space to a Junior ADU, typically $40,000 to $75,000 in Ontario depending on kitchen/bath scope.
- ADU Site Prep & Utilities – grading, drainage, gas and electrical service extensions, and new water/sewer laterals, itemized separately in your written estimate so you can see exactly what the site work is costing.
Every written price pairs with the 365-Day Done Right Promise: if the finished ADU isn’t built to the permitted drawings, we make it right – that commitment is in writing before the project starts, not offered after something goes wrong.
Prefab and Modular Options Near Ontario
Several Ontario and Chino homeowners we’ve worked with wanted a faster build schedule than site-built allows. Factory-built ADU systems from brands like Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, and Tuff Shed can reduce on-site construction time significantly – but they still require a local-jurisdiction permit set, site engineering, and utility connections that must be coordinated with Ontario’s Building & Safety Division. We handle all of that within the same contract, specifying the prefab or modular system, managing the factory deliverable, and completing the foundation and utility work under a single written price. Exterior cladding options like James Hardie fiber cement work within most of these systems and tend to perform well in Ontario’s hot, dry summers.
What to Expect: The Process from First Call to Final Inspection

- Written estimate, before anything else. We review your parcel, zoning, and utility layout, then give you a written price covering design, permit fees, and construction. Haven Standard Clause 1. No work starts without it.
- Design and permit set. We produce construction drawings, structural calculations, Title 24 energy compliance documentation, and any required civil sheets. Ontario’s plan check process typically takes 4 to 8 weeks for a compliant submittal.
- Permit approval and pre-construction. Once the permit is issued, we finalize the construction schedule and confirm the written scope before mobilizing.
- Construction with photo documentation. Every visit is documented with a photo record – you receive evidence of what was found and what was done at each stage, not a verbal summary at the end.
- Final inspection and closeout. We schedule and attend the city’s final inspection. You receive the finaled permit card, the photo record, and the written 365-Day Done Right Promise confirmation.
FAQs: ADU Design & Permitting Near Me in Ontario, CA
How fast can you start my ADU project in Ontario?
We can typically schedule a site assessment call within 24 hours of your first call to (951) 577-3472. A written estimate follows within three to five business days after we’ve reviewed your parcel data and utility connections. Permit submittal for a straightforward Ontario ADU project usually happens within six to eight weeks of the signed agreement – faster if your site has no unusual soil, easement, or utility complications. Call (951) 577-3472 and a live person will give you a timeline based on your specific address, not a generic range.
Do you serve my city – I’m not in Ontario proper?
We regularly work in Chino, Eastvale, Montclair, Upland, Mira Loma, Rancho Cucamonga, and Glen Avon, in addition to Ontario. Each of those cities has its own ADU ordinance and fee schedule, and we carry current code knowledge for all of them. If your parcel is in a city not on that list, call (951) 577-3472 and we’ll confirm coverage in under two minutes.
How much does ADU design and permitting cost in Ontario?
ADU design and permitting in Ontario, CA typically runs $18,000 to $38,000 for the professional services portion alone – drawings, engineering, Title 24 calculations, and permit application management – before construction costs. That range shifts based on ADU type and size:
- Junior ADU (interior conversion): $40,000 to $75,000 all-in, including design, permitting, and construction
- Garage Conversion ADU: $95,000 to $160,000 all-in
- New Detached ADU (600 sq ft): $180,000 to $260,000 all-in, depending on site and finish level
Ontario city plan-check fees for ADUs run approximately $3,500 to $6,500 depending on square footage, and utility connection fees can add $8,000 to $14,000 if a new service lateral is required. Every one of those line items appears in your written estimate before you sign anything, per Haven Standard Clause 1. There is no “call for a quote” on our end – the price is in writing before work starts.
Can I reach someone after hours if I have a question?
A live person answers calls to (951) 577-3472 around the clock. You won’t reach a voicemail queue or a callback promise – a real person picks up, can answer general questions about your project, and can schedule a formal site assessment for the next available slot. If you have a written estimate from another firm already, ask about our free second opinion – we’ll review it and tell you what’s in it and what’s not, at no charge.
Key Takeaways

- Ellery ADU Studio covers Ontario, Chino, Eastvale, Montclair, Upland, Mira Loma, Rancho Cucamonga, and Glen Avon under one contract at one written price.
- Every project starts with a written estimate that itemizes design, permitting, construction, and site/utility work – Haven Standard Clause 1, no exceptions.
- Ontario’s four-foot rear and side setback rules, 50-percent lot coverage cap, and utility connection fee ranges ($8,000-$14,000) are factored into your estimate from the first draft.
- The 365-Day Done Right Promise means if the finished ADU isn’t built to the permitted drawings, we make it right – in writing, before the project starts.
- 900-plus ADUs designed, permitted, and built since 2015. Every one with a photo record and a written price before work started.
- A live person answers (951) 577-3472 around the clock – no voicemail, no callback queue.
Ready to Talk About Your Ontario ADU?
Call (951) 577-3472 to speak with a live person now. Nadia Ellery’s team will confirm whether your parcel qualifies, give you a realistic timeline for Ontario’s current plan-check queue, and schedule a written estimate – no vague ranges, no “we’ll circle back with pricing.” If you already have a written estimate from another firm, ask about the free second opinion. We’ll tell you what the number covers and what it doesn’t, at no charge, before you make any commitment.
Written by Nadia Ellery, Owner at Ellery ADU Studio Ontario, serving Ontario and nearby areas since 2015.
What Our Customers Say
"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."
- Arjun D."They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."
- Mireille T."Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."
- Benedict H.